1. The unloading platform should be equipped with a card.
2. Break point and the highest point solid drawing platform should fall on the building, and must focus on the construction of facilities, such as scaffolding support system should be. Don't be connected to the scaffolding.
3. Concrete beam steel plate platform resting point is embedded and connected with the bolt pad.
4. Horizontal angle between the wire rope should have a 45 degrees to 60 degrees.
5. The beam column from the top of the platform and tensile strength should be checked to ensure the integrity of the building of the platform.
6. The platform can be lifted by tower crane. The retaining ring when the lift platform. It should not be hanging hook directly to the platform and the lifting ring.
7. When you install the steel platform, steel wire rope with hooks should be hung. When adopting other methods, the lattice must be at least 3 corner of the building, the cable should be lined with good people His uncle. The steel platform should be slightly higher. At home.
8. The left and right sides of the steel platform must be fixed with the handrail a dense mesh safety net.
9. Upon the creation of scaffolding, steel platform position must be preserved. Scaffolding poles on either side of the platform should be strengthened by double columns.